UL 680
Standard for Emergency Vault Ventilators and Vault-Ventilating Ports

DETAILS
Edition Number:8SCC Approved:--
Edition Date:2002-11-26DOD Approved: --
Price Code:DANSI Approved: 2018-07-20
Type:ulstd

  • SCOPE

    1 Scope

    1.1 These requirements cover emergency vault ventilators and vault-ventilating ports for installation in a wall.

    1.2 Emergency vault ventilators are intended to provide fresh air to persons locked in the vault by accident or during a robbery.

    1.3 Vault-ventilating ports are intended for connection to an outside ventilating system that provides circulating air while the vault is open.

    1.4 These requirements are intended to evaluate the integrity of electrical wiring and components and to establish burglary resistant ratings. The ratings, based on the net working time to effect entry, are as follows:

    a)    Class M – 1/4 hour;

    b)    Class 1 – 1/2 hour;

    c)    Class 2 – 1 hour; and

    d)    Class 3 – 2 hours.

    1.5 When installed in either a vault door or modular panel that complies with the requirements in the Standard for Burglary Resistant Vault Doors and Modular Panels, UL 608; or a reinforced concrete wall according to the manufacturer's instructions and the Standard Classification for Bank and Mercantile Vault Construction, ASTM F 1090, the products covered by these requirements do not affect the burglary resistance of the vault wall.

    1.6 These requirements do not cover protection against entry by attacks with a burning bar (thermal lance) or explosives.

    1.7 These units are intended to be installed in accordance with the provision of the National Electrical Code, NFPA 70 . However, it is intended that inspection authorities having jurisdiction be consulted before installation of electrical connections.

    1.8 Products covered by these requirements are intended for installation in vaults that are used for the storage of valuables, and that are protected by special security measures that cannot be forced using normal rescue equipment, and require waiting for a time-lock or similar device to release entrapped individuals.

  • TABLE OF CONTENTS
    Expand All

    • Cover
    • Transmittal
    • Table of Contents
      • Body
        • INTRODUCTION
          • 1 Scope
          • 2 General
            • 2.1 Components
            • 2.2 Units of measurement
            • 2.3 Undated references
          • 3 Instructions
        • CONSTRUCTION
          • 4 General
          • 5 Electric Shock
          • 6 Frames and Enclosures
          • 7 Mounting of Parts
          • 8 Protection Against Corrosion
          • 9 Insulating Materials
          • 10 Mechanical Assembly
          • 11 Current-Carrying Parts
          • 12 Motors
          • 13 Installation Wiring Methods
            • 13.1 General
            • 13.2 Terminal compartments
            • 13.3 Terminals
            • 13.4 Leads
            • 13.5 Polarity identification
          • 14 Termination of Raceways
          • 15 Strain Relief
          • 16 Bushings
          • 17 Internal Wiring
            • 17.1 General
            • 17.2 Separation of circuits
          • 18 Grounding
          • 19 Electrical Components
            • 19.1 Capacitors
            • 19.2 Lampholders
            • 19.3 Switches
          • 20 Transformers, Coils, and Relays
          • 21 Overcurrent Protection
          • 22 Spacings
            • 22.1 General
            • 22.2 High-voltage spacings
        • PERFORMANCE
          • 23 Resistance to Entry Test
          • 24 Starting Current Test
          • 25 Input Test
          • 26 Temperature Test
          • 27 Voltage Variation Test
          • 28 Temperature Variation Test
          • 29 Humidity Test
          • 30 Electric Shock Current Test
          • 31 Endurance Test
          • 32 Dielectric Voltage-Withstand Test
            • 32.1 General
            • 32.2 Motors
          • 33 Solenoid Burnout Test
          • 34 Capacitor Overvoltage Test
          • 35 Locked-Rotor Test
            • 35.1 General
            • 35.2 Thermal protectors
          • 36 Thermal Protector Test
        • MANUFACTURING AND PRODUCTION TESTS
          • 37 Production-Line Dielectric Voltage-Withstand
          • 38 Rating
          • 39 Marking
    • APPENDIX A