The following changes in requirements to the Standard for Surge Protective Devices, UL 1449, are being proposed for preliminary review and comment only:
1. For Preliminary Review Only: Clarification in Clause 1.1 to Define MOV
2. For Preliminary Review Only: Expansion of Scope Paragraph 1.1
3. For Preliminary Review Only: Use of the Term "Type"
4. For Preliminary Review Only: Addition of Clause 1.19 to Specify Ambient Temperature
5. For Preliminary Review Only: Revision to Clause 3.18 Defining MLV
6. For Preliminary Review Only: Addition of Acronym for Clause 3.23
7. For Preliminary Review Only: Clarification of Clause 3.48 - SPD Types Using VPR
8. For Preliminary Review Only: Add New Definition Clause 3.46.1 - Type 2 Voltage-Limiting SPD
9. For Preliminary Review Only: Add New Definition Clause 3.46.2 - Type 2 Voltage-Switching SPD
10. For Preliminary Review Only: Revision to 7.2.1.2 - Openings in an Enclosure for Type 3 SPDs
11. For Preliminary Review Only: Addition of New Table 12.3 to Replace Clauses 12.3 - 12.11
12. For Preliminary Review Only: Revision to Allow Terminal Blocks Tested to UL 1059
13. For Preliminary Review Only: Addition of Clauses 19.5 - 19.7 for PWBs
14. For Preliminary Review Only: Additional Reference Included in Clause 27.2
15. For Preliminary Review Only: Clarification that the Same External OCP Be Included in Series with the SPD for All Testing
16. For Preliminary Review Only: Revision to Figure 36.1, Flowcharts 1-4
17. For Preliminary Review Only: Clarification to Table 36.1 to Align with Table 44.4
18. For Preliminary Review Only: Corrections to Table 36.2
19. For Preliminary Review Only: Modification of 40.1.1 Regarding Surge Testing
20. For Preliminary Review Only: Clarification of 40.5.2 Regarding when External Protection is Relied Upon to Yield Compliant Performance Test Results
21. For Preliminary Review Only: Clarification of 40.5.2 for VPR Measurement for Type 1, 2, 3 and 4 Component Assemblies
22. For Preliminary Review Only: Modification of 40.7 Regarding Nominal Discharge Current
23. For Preliminary Review Only: Revision of 40.7.1 to Include 15KA and Increments from 3-10KA
24. For Preliminary Review Only: Clarify Use of Current Generator and Proper Abbreviation in Clause 40.7.1
25. For Preliminary Review Only: Modification of 40.7.2 Regarding Nominal Discharge Currents
26. For Preliminary Review Only: Modification of 40.9.1 Regarding VPR Requirements
27. For Preliminary Review Only: Clarification to Section 41 - Type 5 SPD Surge Testing
28. For Preliminary Review Only: Clarify Testing for Integral Thermal Protection Operation Following Nominal Discharge Current Testing with Addition of Clause 42.2
29. For Preliminary Review Only: Clarification of Table 44.1 to Include Delta Systems Up to 1000V
30. For Preliminary Review Only: Clarification of 44.1.12 Pertaining to Leakage and Ground Continuity Tests After Current Tests
31. For Preliminary Review Only: Revision to 44.2.5 and 44.3.4 Related to Thermal Responsive Devices
32. For Preliminary Review Only: Clarification of Titles for Sections 46 and 47
33. For Preliminary Review Only: Clarification of Section 46 vs Section 47
34. For Preliminary Review Only: Clarify PTC-MOV Testing in Clause 50.5
35. For Preliminary Review Only: Revision to 51.11 to Include Polymeric Enclosures
36. For Preliminary Review Only: Editorial Correction in 58.1
37. For Preliminary Review Only: Revision to Clause 73D.1 to Correct a Reference
38. For Preliminary Review Only: Revision to Markings Section 80
39. For Preliminary Review Only: Revision to SA8.3 to Simplify the Test Method